Rising Bollard Installation

posted in: Uncategorized 0
Client: MACQUARIE TELECOM/ JOHN HOLLAND CONSTRUCTION
Location: MACQUARIE PARK  NSW  2113
Job Type: SUPPLY AND INSTALL 3 AUTOMATIC POP UP BOLLARDS
Automation: BFT AUTOMATIC RISING BOLLARDS
Completed on Time: YES
Completed on Budget: YES
Job Notes : This was an upgrade for security reason’s for one of the main Hubs in Macquarie park Telecom, the site had a Main security sliding gate which had been ram raided before, the rising bollards are installed directly after access has been made through the main sliding gate, one through the main gate the Bollards remain up until the main gate has fully closed, once the main gate has closed the bollards then retract into the ground until the have been passed over, then they return back up securing the site, the job included all excavation and laying of concrete and asphalt once all wiring had been run and the bollards inserted.