Client: S & A CONTRACTING
Location: AUSTRALIAN DEFENCE FORCE, SUTHERLAND MULTI USE DEPOT
Job Type: UP GRADE OF EXISTING DEPOT DOORS
Automation: HEAVY DUTY 3 PHASE GRIFCO ROLLER SHUTTER MOTOR GEARBOXES
Completed on Time: YES
Completed on Budget: YES
Job Notes : This project was an upgrade of all existing roller shutters at the Sutherland defence force depot, all of the existing shutters were removed and replaced with new commercial roller shutter’s, some of the doors had built in wicket gates that were not compliant with New regulations of walk in height of 2.1 meters, all shutter brackets have been fully welded to the existing RHJ structural beams with Vertical up welds, all doors are operated off 3phase contactor boxes and Grifco motor and safety cut-out switches to the wicket gates that are built into the shutter for Pedestrian access.